Case studies
Three projects — transportation, energy, and mining — chosen because each one's report had to survive a permitting board or a lender's review.
Transportation / Infrastructure
Slope stability analysis and rockfall mitigation design for a 6-mile mountain corridor widening, keeping the project on its permitting timeline.
Energy
Foundation design recommendations for 42 turbine pads across variable bedrock, informed by seismic refraction survey.
Mining
Tailings storage facility geotechnical characterization and stability analysis supporting a state dam-safety permit.
“Stratum's borings program found the fault splay our first consultant missed — a year before we broke ground, not after.”
Dana Reyes— VP of Engineering, Continental Rail Partners
Tell us about the site and the timeline. We'll scope the investigation and get a proposal back within a week.
Request a proposalOffices
Denver, COHQ
Salt Lake City, UT
Reno, NV